Capital Improvement Projects
2024 Presentation
Current project status
These projects are scheduled for various time frames over the next few years. Details will be posted as they become available.
Page Updated 03/11/2024
16 Road guardrail replacement
Replace guardrail at N road hill.
18 Road FLAP
Pave 18 Road from Highline Canal to CPW camp grounds.
22 1/2 Rd and greenbelt
Pipe and repair drainage swale on Greenbelt and construct a concrete path on 22 1/2 Rd.
29 Road and I-70 interchange
Visit the 29 Road Interchange project webpage for current information on the project.
32 1/2 Road, phase 1a - south of E Rd to GVIC canal
Construct missing 32 1/2 Rd section through private property at 3249 E Rd. and north of E Rd including canal crossing bridge.
32 1/2 Road, phase 2 - north of canal to UPRR crossing
Improvements needed to bring to urban collector standards and provide multi-modal use.
38 Road bike and pedestrian improvements (Hwy 6 south to OMID)
Widen 38 Rd, add shared use path on west side and install new guardrail. Requires wall along canal and pedestrian bridges.
Coffman Road rehabilitation, Landfill to SH-141
Rehab roadway from Landfill entrance to Hwy 141 for 3 1/4 miles. South .6 miles to be improved to urban standards. Multi-year project.
Douglas Wash detention basin
Final design of detention basin.
E 1/2 Rd. (Orchard Ave.) phase 1 road improvements
Construction of urban collector section from Warrior Way to Eastbrook St. to provide pedestrian and bicycle improvements and increase traffic safety. Includes replacement of Lewis Wash bridge.
E Road, phase 2b, 31 Rd and E Rd bridge
Replacement of bridge and widening of E Rd at 31 Rd intersection to match improvements on phase 2a.
E Road improvements, phase 3 (Green Acres St to 33 Road)
Urban section per the E Road corridor study, completes E Road improvements and provides for safe multimodal traffic.
Independence Valley subdivision
Wide-crack repair with seal coat of subdivision roads.
Mesa Q-6.8 bridge rehabilitation
Rehabilitate bridge of West Salt Creek.
Kimball Creek & Buzzard Creek intersection repair
Fix settlement and possible slide in intersection.
Little Park Road rehab
Rehab 1.7 mile section of road from bentonite pit to Bangs Canyon trailhead.
MM-O-16.1 bridge replacement
Replace functionally obsolete 10'x10' box culvert, 22 1/2 ' lg., over East Branch Reed Wash.
Melody Estates drainage
Install dry well drainage system in subdivision to address roadway flooding.
N. River Road - rehab phase 2 section
Drainage improvements.
Riverfront trail connector, 33 1/2 Rd to Palisade
Conceptual study of alternate routes for missing section of trail.
Riverfront Trail - Las Colonias to 29 Rd
CPW project in partnership with City and County. Complete missing section of Riverfront Trail.
Rosevale Road drainage improvement project
Completing drainage design to address flooding concerns on Rosevale Rd.
Go to the Rosevale Road Drainage Improvement Project webpage for current information on the project.
S. Broadway/SH 340 turn lane
Add right turn lane on SH 340 at S. Broadway.